International Engineering and Construction (IEC) commenced arbitration against Baker Hughes (formerly GE Oil and Gas) over construction delays in the building of a liquefied natural gas power plant in Nigeria. The three-arbitrator panel issued an award finding that both GE and IEC breached the construction contracts. While the panel awarded IEC more than $7 million plus interest from GE, it also ordered IEC to pay GE $11 million plus interest, as well as 95% of the arbitration costs and GE’s costs. The net result was that IEC was ordered to pay more than $8 million plus interest.
GE moved to confirm the arbitration award and IEC cross-moved to vacate the award on the grounds that the arbitrators manifestly disregarded the law and the plain language of the parties’ contracts. Although the district court noted that IEC’s arguments “might have traction” if the court were writing on a blank slate, based upon the strong deference owed to arbitrators, the court found that IEC’s vacatur arguments “fell short,” and confirmed the award in favor of GE.
Baker Hughes Energy Services, LLC v. International Engineering & Construction S.A., No. 1:21-cv-01961 (S.D.N.Y. Nov. 16, 2021)
©2026 Carlton Fields, P.A. Carlton Fields practices law in California through Carlton Fields, LLP. Carlton Fields publications should not be construed as legal advice on any specific facts or circumstances. The contents are intended for general information and educational purposes only, and should not be relied on as if it were advice about a particular fact situation. The distribution of this publication is not intended to create, and receipt of it does not constitute, an attorney-client relationship with Carlton Fields. This publication may not be quoted or referred to in any other publication or proceeding without the prior written consent of the firm, to be given or withheld at our discretion. To request reprint permission for any of our publications, please use our Contact Us form via the link below. The views set forth herein are the personal views of the author and do not necessarily reflect those of the firm. This site may contain hypertext links to information created and maintained by other entities. Carlton Fields does not control or guarantee the accuracy or completeness of this outside information, nor is the inclusion of a link to be intended as an endorsement of those outside sites.